top of page

Carrier rooftop unit replacement by crane

​
​

An old Carrier rooftop unit lifted off its curb and a new Carrier unit craned onto the same curb, with the crane working from a tight back laneway.

An old Carrier gas rooftop unit on a flat commercial roof needed replacing. The crane had to work from a narrow back laneway, with parked cars and neighbouring buildings close on both sides.

  • Rigged the old Carrier rooftop unit with lifting straps and lifted it off its roof curb by crane.
  • Set up the boom truck in the narrow back laneway below the roof.
  • Lifted the new Carrier rooftop unit up from the flatbed and over the roof edge.
  • Guided the new unit down and set it on the existing roof curb.
  • Finished with the new unit in place on the curb and its gas line connected.

Planning a rooftop or heating replacement?

Tell us about your building and we’ll come back with a plan and a quote.

bottom of page