top of page
< Back

Commercial boiler replacement in a mechanical room

​
​

A commercial gas-fired boiler replaced in a mechanical room, with gas piping, venting and controls reconnected.

The old commercial boiler was removed from its housekeeping pad and a new gas-fired boiler installed in its place, tied into the existing heating piping, gas supply and flue.

  • Removed the old boiler from the mechanical room.
  • Set the new commercial boiler on the existing concrete pad.
  • Reconnected the gas train, heating water piping and the stainless steel flue.
  • Wired the boiler controls.

Planning a rooftop or heating replacement?

Tell us about your building and we’ll come back with a plan and a quote.

bottom of page