top of page
< Back

Multiple rooftop units replaced by crane in Toronto

​
​

Several packaged rooftop units lifted onto a large flat roof, with new gas piping run to each unit.

Several packaged rooftop units were replaced on a large gravel roof, with the Toronto skyline and the CN Tower in view. A mobile crane set each unit, and new gas piping was run across the roof to serve them.

  • Lifted each new rooftop unit onto the roof with a mobile crane.
  • Set the units on their roof curbs.
  • Ran new gas piping across the roof on supports to each unit.

Planning a rooftop or heating replacement?

Tell us about your building and we’ll come back with a plan and a quote.

bottom of page