top of page
< Back

Rooftop and heating replacements in Scarborough

Multi-tenant commercial/industrial building, Scarborough
Multi-tenant commercial/industrial building, Scarborough

Three rooftop units and a woodshop system replaced as one planned capital program.

A 2004 rooftop unit serving one suite had a perforated heat exchanger, two more rooftop units were due for replacement, and a woodshop suite's equipment no longer suited how the space was used.

  • Replaced the equipment serving the woodshop suite with units matched to its use (19 to 29 December 2025).

  • Replaced three rooftop units, including the 2004 unit with the failed heat exchanger (5 to 11 February 2026).

  • Set the new equipment in place by crane.

  • Placed the building's equipment on a Burban preventive-maintenance agreement.

Planning a rooftop or heating replacement?

Tell us about your building and we’ll come back with a plan and a quote.

bottom of page